Warning
Ensure that the wall can bear at least 4 times the weight of the cellular AP. In other words, the wall must support 30 kgs (66 lbs).
Remove the nuts and bolts from the assembled installation bracket kit and set aside.
Hold the installation bracket against the wall, with the arrow pointing up. Mark the drilling locations using a pencil or marker.
Drill two 10mm (.4 in) diameter by 70 mm (2.8 in) deep holes in the wall at the marked locations.
Using a hammer, drive two M8 * 80 expansion bolts into the wall. Lock the expansion bolts in place using a wrench.
Check the up/down direction of the installation bracket, and then hang the bracket on the two M8 * 80 expansion screws.
Align the pin on the cellular AP bracket to the pin holes on the wall bracket, lower the pin into the pin holes vertically so that the hook on the mounting bracket is firmly connectedwith the slot on the wall bracket.
Tighten the screw on the top of the bracket using a Phillips screwdriver to complete the installation.